The Rangels

Das Haus Logo
Construction Progress 15 of 64 completed
23%
🔍
Buy
Done
Ac unit
Buy
Done
Amplifier
Buy
Done
Appliances
Buy
Done
Back patio
Buy
Done
Backsplash
Buy
Done
Basement door tighten frame
Buy
Done
Basement window trim exterior

Occorre solo mettere silicone dipingere

Buy
Done
Bedroom rug
Buy
Done
Breakfast nook benches
Buy
Done
Cabinets
Buy
Done
Clean windows

Manca solo la finestra nel nostro bagno

Buy
Done
Closet shelves
Buy
Done
Couch
Buy
Done
Countertops
Buy
Done
Crawl space cleaning up
Buy
Done
Crawl space door
Buy
Done
Crawl space joist spacing
Buy
Done
Door knob basement
Buy
Done
Doors
Buy
Done
Driveway
Buy
Done
Ethernet cables
Buy
Done
Fascia
Buy
Done
Fireplace
Buy
Done
Flooring
Buy
Done
Frame doors to office
Buy
Done
Frame doors to study room
Buy
Done
Garage doors
Buy
Done
Gutters
Buy
Done
Inside electrical
Buy
Done
Install stairs
Buy
Done
Landscaping
Buy
Done
Laundry room shelves
Buy
Done
Laundry room tile
Buy
Done
Living room rug
Buy
Done
Master bathroom tile
Buy
Done
Master vanity
Buy
Done
Modem
Buy
Done
Office bookshelves
Buy
Done
Office fireplace
Buy
Done
Our bed
Buy
Done
Outside electrical
Buy
Done
Painting basement door
Buy
Done
Painting imperfections
Buy
Done
Playroom bookshelves
Buy
Done
Plumbing
Buy
Done
Porches
Buy
Done
Projector bedroom
Buy
Done
Security cameras
Buy
Done
Shower
Buy
Done
Soffet
Buy
Done
Speakers
Buy
Done
Split unit
Buy
Done
Thea bathroom tile
Buy
Done
Thea bed
Buy
Done
Thea room rug
Buy
Done
Thea's vanity
Buy
Done
Tighten basement window frame
Buy
Done
Toilets
Buy
Done
Trim
Buy
Done
Vacuum vent system
Buy
Done
Visitors vanity
Buy
Done
WiFi access points
Buy
Done
Window framing
Buy
Done
Wire panel box